To the central content area

Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Lead-Acid Batteries

Absrtact
For the auditing and certification of waste lead batteries recycling facilities, the main tasks included the auditing processes like collection quantity, recycling quantity, operational processes, environment and accounting. According to the results of auditing and certification from January 1, 2015 to December 31, 2016, the auditing and certification quantity of waste lead acid batteries(general types)was 130,067,238 kg, and the auditing and certification quantity of waste lead acid batteries(special types)was10,823,239 kg. The total number of the field auditing for recycling facilities was 3,904 trips. For the results of the auditing training, every new inspector was required to complete at least 40-hours training and related examinations. The professional trainings were completed on February 27~28, 2015 and February 27~28, 2016. According to the results of operational processes auditing for recycling facilities, the major abnormal events were disqualified auditing and certification facility which contributed 63.24% of the total. For the results of environment auditing, the major abnormal events were the roof of the factories been damaged by typhoon which contributed 50.00% of the total. The major abnormal events happened in waste lead batteries recycling facilities were mainly the malfunctions of auditing and certification equipment and the closed-circuit television system malfunctions. There were total 135 major abnormal events which contributed 90.06% of the project’s total major abnormal events. In the other hand, the minor abnormal events were mechanical failure and maintenance. It happened 19 times which accounted for 79.17% of the project’s total minor abnormal events. The accounting auditing for the recycling facilities showed no major abnormal events. During the project period, foundation of Taiwan industry service carried out 19 applications for newly set up or modified of 6 subsidized recycling facilities. The scoring penalty for the recycling facilities was counted total 5 points. The major causes for the scoring penalty were the violations of operational processes.
Keyword
Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Lead-Acid Batteries
Open
top